Berths, fuelling, provisioning and in-marina clearance — what is built, what is targeted, and when.

Planned berths
180
Superyacht slips
50
Largest slip (295 ft)
90m
Fuelling targeted
Q2 2026

In short

Benoa's full-service superyacht marina is planned to deliver 180 berths — 50 of them superyacht slips for vessels up to 295 ft (90m) — with in-marina fuelling, provisioning, and integrated customs and immigration. Every facility here is a published plan from 2024–2026 reporting; the timeline may still shift.

More than a row of berths

What "full-service" means at Benoa

A full-service marina lets a yacht arrive, clear in, refuel, provision, get technical work done and send guests ashore — all inside one licensed facility.

Historically the old Bali Marina held boats up to about 30m, with room for two 35m yachts; anything larger used port-authority jetties. Fifty 90m-capable slips is a change of category, not a refit.

  • Groundbreaking 22 May 2025 — PT Marina Development Indonesia with Pelindo.
  • Pontoons High-performance floating concrete by SF Marina of Sweden.

The groundbreaking is the one hard, dated event; everything after it is phased plan.

Phase by phase

Which facilities arrive when

The published phasing, as reported across 2024–2026.

Phase 1

Published target
Q4 2025
Facilities delivered
Dock B — 40 berths plus a welcome station; pilot operations

Technical phase

Published target
Q2 2026
Facilities delivered
Maintenance, repair, workshops and fuelling

Phase 3

Published target
Q3 2026
Facilities delivered
180 berths, in-marina customs and immigration, provisioning, digital booking; slips up to 90m

Phase 4

Published target
Q4 2027
Facilities delivered
Waterfront precinct — F&B, retail, yacht-sales offices, MICE venues

All 180 berths were anticipated structurally complete by mid-2026. Projections beyond Q3 2026 are the most likely to move.

At build-out

The complete facilities list

Per published plans as of 2026, the end state covers five service groups.
  • Berthing

    180 berths, 50 superyacht slips up to 90m, on SF Marina floating pontoons.

  • Technical services

    Maintenance, repair, workshops and fuelling from the Q2 2026 phase.

  • Clearance

    Customs and immigration inside the marina, in the Q3 2026 scope.

  • Operations

    Streamlined provisioning and digital booking for berths and services.

  • Shoreside precinct

    Dining, premium retail, yacht sales and MICE venues — Q4 2027.

  • Shore power

    Not itemised yet — confirm voltage and amperage with your agent first.

How it works today

Fuelling and provisioning before Phase 3

Until a fuel dock is confirmed operational, superyachts plan the way they always have in Indonesia.

It is slower and more paperwork-heavy than the one-stop future being marketed, but it works today.

  • Bunkering Through a licensed local agent, usually by truck to the quay, booked days ahead.
  • Provisioning Chefs and pursers use Bali-based provisioners, trucked dockside.
  • Clearance Runs across several agencies until the in-marina counter opens.

Good to know

Benoa marina facility questions

All questions
How many superyacht berths will Benoa have?

The plan calls for 180 berths in total, of which 50 slips are designated for superyachts up to 295 ft (90m).

Will customs and immigration sit inside the marina?

The Phase 3 plan says so, from Q3 2026. It would not remove any paperwork, but would put officials, agent and yacht within a hundred metres of each other.

Is there shore power for large yachts?

No Benoa-specific electrical spec had been released as of mid-2026 reporting. Captains with heavy hotel loads should confirm through their agent or the marina office.

Can I charter from Benoa before build-out?

Yes. The day-charter water — Nusa Dua, Uluwatu, Nusa Penida and Lembongan — is available now; each phase mainly upgrades the shoreside experience.

Superyacht guides

More on superyachts in Bali

Before you commit

Get the on-the-ground status for your vessel

For a berth, a bunkering plan or a facilities briefing, the concierge confirms the current status at Benoa.

Dated to 2024–2026 reporting, as of 2026 and subject to change.